StarSolar

Audit Verification Stage: Active

Stop Donating Your Profits to the National Grid.

You've seen the Solar Scout preliminary numbers. Now, let's verify your building's capacity and lock in your energy security roadmap for 2026.

Commercial Risk Warning

The Most Expensive Energy is the Energy You Didn’t Produce Yesterday.

While you wait for energy prices to "stabilize," your competitors have already fixed their power costs at 5p per kWh for the next 25 years. Every month you delay is another £3,000—£15,000 leaked from your bottom line.

400%

Average Grid Markup vs Solar Generation

25 Yrs

Fixed Cost Energy Security Guarantee

"If you don't own your power, someone else owns your profit margin."

Operational Margin Loss

Grid Capacity Alert

Local substation capacity is finite. Once your local grid is maxed out by competitors, your business is locked out of the highest ROI generation models.

The 3-Minute Strategic Briefing.

Why 50kW+ systems are the highest-yielding asset in UK commercial real estate today.

The Commercial Standard.

We don't just "install panels." We build revenue-generating assets that protect your production capacity.

G99 & Grid Mastery

We handle the complex DNO negotiations and capacity checks that stop 60% of projects before they start.

Zero-Downtime Install

Our 'Ghost Install' protocol ensures your facility stays at 100% output while we work.

Capital Protection

Bloomberg Tier-1 technology only. Built for 25+ years of industrial performance.

Data Realism

No 'best case' fluff. We use actual half-hourly data to prove the ROI before a bolt is turned.

Strategic Tax Advantage

How the UK Govt Pays for Your System.

Under current Full Expensing rules, your business can claim 100% capital allowances on solar PV equipment. This turns an infrastructure project into a massive Year-1 tax write-off.

"This turns capital expenditure into immediate cash-flow relief. We've seen projects reach break-even 40% faster using this mechanism."

Year 1 Cash Flow Impact

Gross Capex Est.

£150,000

Tax Offset (25%)

-£37,500

Gross Year 1 Savings Est.

-£22,000

Net Year 1 Cost

£90,500

Figures based on standard UK Corporation Tax. Consult your advisor for project-specific eligibility.

Real Success Stories.

High-performance installations that changed the risk profile of UK manufacturing businesses.

Midlands Tooling Co.

Precision Tooling Manufacturer

Year 1 Savings

£28,400

ROI Term

3.1 Yrs

Kent Logistics Hub

Cold Storage Distribution

Year 1 Savings

£52,100

ROI Term

2.8 Yrs

Stop the Leak. Secure Your Grid Slot.

Your Solar Scout audit is 92% accurate. The final step is verifying your Grid Feasibility. This call ensures your building qualifies for a DNO connection before the local substation reaches its limit.

Verify Audit Accuracy against Utility Data

100% Free DNO/Grid Feasibility Check

Zero-Pressure Technical Assessment

3 Slots Left This Week

"First-come booking priority"

StarSolar

The UK's specialist in industrial solar acquisition and grid management. We turn factory roofs into financial powerhouses.

© 2026 StarSolar Commercial Ltd. | London & Midlands | All Rights Reserved.